To Helensvale
9:07 pm
- 9:22 pm
- 9:37 pm
- 9:52 pm
- 10:07 pm
at Mermaid Beach station, platform 1
G:LINK TRAM · GOLD COAST
The G:link tram runs between Helensvale and Burleigh Heads. On weekdays the first service leaves around 4:33 am and the last around 12:35 am, with a service every 8 min at peak.
YOUR ROUTE
Enter an address or suburb to check how close the G:link comes to you.
Walking time is an estimate from distance, not a route on foot. GoSEQ doesn’t save your search.
Know exactly when to leave: get the free appAfter the extension to the tram network, some changes were made to some local bus services on Monday 7 September.
Buses will replace trams between Helensvale and Gold Coast University Hospital stations each night from 7:30pm to last service:Sunday 18 to Thursday 22 OctoberMonday 26 to Thursday 29 October.This is due to Coomera Connector (Stage 1) construction works, Normal services will resu
From TransLink’s service alerts, as of now. Crashes, closures and roadworks marked “reported” come from HERE’s traffic feed (© HERE) and may be out of date.
To Helensvale
9:07 pm
at Mermaid Beach station, platform 1
To Burleigh Heads
9:05 pm
at Mermaid Beach station, platform 2
Timetable times at a stop in the middle of the route, not live. For your own stop, pick it under Stops; for live times, open GoSEQ.
| When | To Helensvale | To Burleigh Heads |
|---|---|---|
| Peakweekdays, 7–9 am and 4–6 pm | every 8 min | every 8 min |
| Off-peakweekdays, 9 am–3 pm | every 8 min | every 8 min |
| Saturday8 am–6 pm | every 10 min | every 10 min |
| Sunday8 am–6 pm | every 10 min | every 10 min |
| First service | 4:59 am | 4:33 am |
| Last service | 12:22 am | 12:35 am |
| End to end | 62 min · 32 stops | 63 min · 33 stops |
| Services a dayweekdays | 131 | 134 |
Weekdays131 a day
Saturday116 a day
Sunday106 a day
A typical day in the timetable, at Mermaid Beach station, platform 1. Shaded: weekday peak.
Yes. The G:link is in today’s timetable (Tuesday). For live times, delays and cancellations, open GoSEQ: it shows where each tram is right now.
Towards Helensvale, it runs every 8 min at weekday peak, every 8 min in the middle of a weekday, every 10 min on Saturdays, every 10 min on Sundays, by the timetable.
On weekdays, the first service towards Helensvale leaves Mermaid Beach station, platform 1 at about 4:59 am and the last at about 12:22 am.
The G:link tram runs between Helensvale and Burleigh Heads. End to end takes about 62 minutes, with 32 stops each way.
Yes, in GoSEQ. This page shows TransLink’s timetable; the app adds live positions, a countdown to your tram, delays and an alert before your stop.
GOSEQ
Know when to leave, see where your tram is right now, and get a nudge before your stop.
Open in GoSEQ